Loaded guardrail pile driver is a product developed by Hengwang Group in order to meet market demand and combine its own technology.
The pile driver is a new product integrating driving, pulling and drilling.
Main feature:
1. The body walking system has good buffering effect and more comfortable operation.
2. The key components are standardized and matched, which can adapt to various harsh working environments.
3. The overall layout of the loading guardrail pile driver is good, the structure is compact, the center of gravity is arranged reasonably, and the stability is good.
Parameter:
Model | HWH940 |
Working weight | 6200KG |
Engine brand | YUNNEI |
Engine Power | 76KW |
Power Head | #75 |
Power Head Weight | 140Kg |
Overall Dimension | 4970*2700*2700 |
Due to the continuous update and progress of technology, the difference between the technical parameters and configuration and the actual product is subject to the actual delivery.