
| model | HW910 | HW910-1 |
| engine | Yuchai Power | |
| power(KW) | 59 | 59 |
| Drill pipe type(mm) | φ60*2000 | φ60*2000 |
| Drilling diameter(mm) | φ80-105 | φ80-105 |
| Maximum working torque(N.m) | 980 | 980 |
| Swing speed(rpm) | 0-105 | 0-105 |
| Propulsion(kN) | 15 | 15 |
| Lifting power(kN) | 25 | 25 |
| Propulsion method | oil cylinder chain | |
| Leveling angle | ||
| Walking speed(km/h) | 2 | 2 |
| Gradeability | 30° | 30° |
| gross weight(kg) | 3100 | 3260 |
| Shipping dimensions(mm) | 4100*2030*2020 | 4100*2030*2020 |
| Dust collection method | Dry dust collection | |
| exhaust volume |
Due to the continuous update and progress of technology, the difference between the technical parameters and configuration and the actual product is subject to the actual delivery.




In down-the-hole drilling a drill rod is fitted with a hammer at its lower end.
The hammer, which is mounted on the drill bit, is activated through the addition of compressed air and driven into the ground – simultaneously rotating and impacting.
This method is mainly applied for hard to very hard rock and/or for penetrating large boulders.
Main feature:
1. The borehole drill rig with two-stage dry dust removal device, which has little pollution to the environment;
2. HW910 is equipped with dry dust collector, drill pipe changer, and adopts the most advanced design and layout.
3. It is a trusted machine for mining and construction companies and contractors engaged in presplitting and conventional production blasthole drilling.
