How to properly maintain the highway pile driver

Aug 24, 2022

1661310158944547.jpg

Introduction to the maintenance method of highway piling machine:


1. Every day


1. Check for oil, water, gas leakage and overheating of parts;


2. Check the level of diesel engine oil, coolant and hydraulic oil;


3. Check the tire pressure and tire damage;


4. Check the meters and lights;


5. Inject butter at each hinge point.


2. Every 50 hours


1. Check and tighten the front and rear drive shaft bolts;


2. Check the transmission oil level;


3. Check and adjust the foot brake and hand brake, brake booster oil;


4. Check the throttle control and speed change control system;


3. Every 100 hours


1. Replace the transmission oil (every 600 hours thereafter), and clean the oil pan filter;


2. Change the engine oil (every 600 hours thereafter);


3. Check the battery fluid level and apply Vaseline to the battery terminals;


4. Check the tightening of rim and brake disc bolts and bridge bolts;


5. Check the tightness of each fastening bolt.


4. Every 200 hours


1. Check the oil level of the front and rear axles;


2. Clean the air filter (replace the filter element if necessary);


3. Clean oil, diesel and transmission oil filters;


4. Measure the tire pressure to be 0.27~0.31Mpa;


5. Check whether the welding seam of the working device and the front and rear frames is cracked;


6. Check the tightness of the generator and fan belts.


5. Every 600 hours


1. Replace the front and rear axle gear oil (every 1000 hours thereafter);


2. Clean the oil suction filter of the diesel tank;


3. Remove the pollutants on the surface of the water tank and radiator;


4. Replace engine oil, replace oil, diesel oil filter;


5. Replace the transmission oil and oil filter;


6. Check the engine valve clearance.


6. Every 1200 hours


1. Replace the hydraulic oil, clean or replace the oil filter, and clean the oil tank;


2. Check the operation of the engine;


3. Check the working condition of the hydraulic system;


4. Check the steering system performance;


5. Check the performance of the braking system and replace the brake fluid.


7. Every 2400 hours


1. Overhaul the engine according to the engine manual;


2. Disassemble and inspect the gearbox and torque converter;


3. Disassemble inspection of the front and rear axles;


4. Check the welding seam of each part of the whole machine.


The construction life and construction efficiency of highway piling machines are closely related to daily maintenance. Correct and effective maintenance methods can ensure the smooth and efficient construction process of the piling machine, ensure the normal progress of the construction progress and obtain more economic benefits.